Region: United States
-
MDOT I-94 DB West Ave Elm Ave US-127 Interchange
Our firm led the reconstruction, rehabilitation and widening of I-94 from east of Airport Road to west of the Grand River and east of the Cooper Street interchange to east of Dettman Road, spanning 3.5 miles. This project included converting the I-94/US-127/M-50/West Avenue interchange into a diverging diamond interchange (DDI) to enhance traffic flow and…
-
I-94 Under Trumbull Avenue
The Trumbull Avenue bridge replacement over I-94 in Detroit was advanced as an early phase of the I-94 Modernization project to address the severely deteriorated condition of the existing structure and accommodate the planned future widening of I-94 below. The new bridge is a two-span steel plate girder structure supported by tall wall abutments and…
-
Escanaba & Lake Superior Rail Road over US-2
A new single-span thru-girder railroad bridge was constructed over US-2 on a realigned track, improving rail operations while maintaining uninterrupted train service during construction. Pedestrian access along US-2 was provided through a box culvert located behind the new bridge abutment, minimizing the bridge span and enhancing safety. The design also included salvaging the existing bridge…
-
Farm Lane Road & Rail Grade Separation
Conversion of two-lane roadway with two separate at-grade railroad crossings to a four-lane boulevard section with grade separated crossings on the campus of Michigan State University. This Farm Lane Grade Separation and roadway project extended from Mt. Hope Road northerly to Wilson Road and is located on the campus of Michigan State University (MSU), in…
-
Woolf Logistics Center
This 1,900-acre rail-served logistics center is a pivotal hub for corporations such as Mark Anthony Brewing, Nestlé, and Red Bull/Rauch/Ball (RRB). To date, approximately 4 million square feet of industrial buildings on over 800 acres have been designed and completed, making it a significant development in the region. Our firm provided extensive planning and coordination…
-
Superstition Vistas Water Campus and Transmission Main
Our team provided regional water master planning for 8,000 acres of proposed development, expanding the Apache Junction Water District system to serve 10,000 new homes and commercial uses. We developed a hydraulic model, identified future storage and booster pump facilities, and created tie-ins to existing and future water treatment facilities with redundant groundwater supply options….
-
Sun Streams Solar
Our firm provided comprehensive civil-related design and documentation for a 5,500-acre utility solar facility near the Palo Verde Nuclear Power Plant, followed by a 3,500-acre expansion. Our services included rezoning and entitlement, detailed drainage analyses, grading and earthwork design, and preparation of construction documents. For the expansion, we conducted extensive hydrologic and hydraulic evaluations using…
-
Silver Valley Elementary School
Silver Valley Elementary School, part of the Queen Creek Unified School District, is situated in the Cadence master-planned community in Mesa. While the site boundaries were established, none of the surrounding street or utility infrastructure had been designed when the project began. Our team worked closely with the master developer’s engineer to coordinate all necessary…
-
Serrano Solar
Our team provided comprehensive civil engineering and surveying services for a 1,300-acre, 170MW solar energy farm across Pinal (150 acres) and Pima (1,150 acres) Counties. The site includes solar panel arrays, battery storage, fire staging areas, and connecting gravel roads. We delivered site planning and civil design to support the minor comprehensive plan amendment and…
-
Radiance at Superstition Vistas
Our firm provided comprehensive engineering and construction management services for a signature master-planned residential community in the east valley of the Phoenix metropolitan area, Arizona. This ambitious project encompasses 2,700 acres initially, with plans to expand to 8,500 acres, more than doubling the size of Apache Junction. The development will feature 10,000 new single-family homes,…
-
North Airport Road Water Campus & Well Improvements
The Phase 1 Expansion of the North Airport Road Water Campus represents a comprehensive initiative to enhance water treatment capabilities and ensure long-term infrastructure reliability. Currently, the project involves installing two additional arsenic filter vessels, recirculation pumps, and day tank booster pumps, alongside constructing a reclaim tank with all necessary appurtenant piping. Simultaneously, work progresses…