Region: United States

  • Ferring Pharmaceuticals Building Addition

    Provided engineering design, landscape architecture services, and construction management for the proposed building addition and realignment of the main entrance drive from Interpace Parkway to the Ferring Pharmaceuticals office building in Parsipanny-Troy Hills. Colliers Engineering & Design professionals coordinated the work closely with the client and the architect during the project, the design of which…

  • Fed Ex Hub – Phase 1 & 2

    Colliers Engineering & Design provided structural and geotechnical engineering services for the design of a skewed precast 84-foot long, 24-foot x 8.5-foot single cell culvert with a concrete overlay carrying four lanes of traffic over Catasauqua Creek. The culvert is underlain by Karst geology and is part of the larger Willowbrook Road improvements project associated…

  • US Route 41 FDOT Corridor Survey

    Colliers Engineering & Design was recently awarded a Florida Department of Transportation (FDOT) Continuing Service contract for Survey Support in District 7 under Wantman Group Inc. The initial task order involved an updated control survey and topographic design survey for five miles of US Route 41 in Hillsborough County, from Bullfrog Creek to Denver Street….

  • Yavapai-Apache Broadband Initiative

    The COVID-19 pandemic highlighted the critical need for reliable broadband on Tribal lands. To address this issue, the Yavapai-Apache Nation (YAN) secured an NTIA Tribal Broadband Connectivity Grant. YAN commissioned our firm to conduct a feasibility study for constructing, operating, and maintaining a fiber optic network across six Tribal communities. Working closely with Tribal leaders,…

  • UTSA Guadalupe Hall

    Colliers Engineering & Design (CED) provided surveying services for the new 110,000 SF residence hall at the University of Texas at San Antonio. The project includes housing for approximately 360 students, a common area, and a full-service coffee shop. Services included bore location staking and locating fences and fence posts. Field Crews took pictures of…

  • Balligomingo Road Slope Failures

    Balligomingo Road in West Conshohocken has been closed since June 2015, after a mudslide spilled debris across the roadway and left the adjoining hillside unstable. Because the location of the area of slope failure that caused the road closure is remote and difficult to access with conventional survey equipment, Colliers Engineering & Design was retained…

  • Morgan’s Wonderland Camp

    Morgan’s Wonderland Camp is an ultra-accessible camp for all ages and abilities, located near the intersection of Bulverde and Evans Road. The camp is located on a 102-acre plot and will be able to accommodate over 500 campers, including those with special needs. This unique park will feature a 30,000-square-foot Welcome Center (complete with kitchen…

  • Morgan’s Inspiration Island

    Morgan’s Inspiration Island is a one-of-a-kind, ultra-accessible, award-winning splash park. The splash park’s attractions include five splash pads with a variety of themes and equipment. Colliers Engineering & Design (CED) performed survey services to create existing conditions and property line plans from which to base the civil portions of the park design. CED designed the…

  • Mars Confections Facility Expansion

    Colliers Engineering & Design provided Subsurface Utility Engineering (SUE) for a large expansion at the Mars Waco, TX confections facility. Our services included Quality Level “D” Records Research through Quality Level “A” Utility Exposure. Our firm was engaged by Haskell Corporation to provide utility investigation and mapping in conjunction with the major expansion at the…

  • Glendora Clock Tower Telecom Installation

    Contracted to design a telecommunications installation at the Glendora Fire Company in a residential section of Gloucester Township. In order to meet the requirements of the carrier, landlord, and Township, a functioning clock tower was proposed to house telecommunications antennas instead of a more common tower installation. The clock tower consists of steel and fiber…

  • MDOT I-94 DB West Ave Elm Ave US-127 Interchange

    Our firm led the reconstruction, rehabilitation and widening of I-94 from east of Airport Road to west of the Grand River and east of the Cooper Street interchange to east of Dettman Road, spanning 3.5 miles. This project included converting the I-94/US-127/M-50/West Avenue interchange into a diverging diamond interchange (DDI) to enhance traffic flow and…

  • I-94 Under Trumbull Avenue

    The Trumbull Avenue bridge replacement over I-94 in Detroit was advanced as an early phase of the I-94 Modernization project to address the severely deteriorated condition of the existing structure and accommodate the planned future widening of I-94 below. The new bridge is a two-span steel plate girder structure supported by tall wall abutments and…