247th Avenue Roadway Improvements
Buckeye, Arizona2,960 LF of full-street section with removal of existing roadway and design of a new stormwater culvert crossing to replace an existing wet crossing.
New storm drains, curb, gutter, sidewalks, curb returns and ramps.
Paving plans, drainage report, signing and striping plans, storm water pollution prevention plans and cost estimating.
SERVICES
- Construction Management
- Highway Design
- Land Survey