Region: Central
-
Poultry Testing Labs
When a food company’s growth outpaces its ability to test what it produces, the answer is not more outsourcing. It is building the capability in-house. CWI partnered with Midwest Laboratories to design and build the first ground-up, large-scale microbiology poultry testing lab of its kind, a 23,000-square-foot facility in Fremont, Nebraska that gives the company…
-
100 & Main
Some sites fight you. A steep slope, a condensed lot, a busy pedestrian corner that demands presence without overwhelm. The challenge at 100 & Main was designing a building that could hold its own in one of Old Bellevue’s most visible locations while respecting everything around it. Ten premier residential units. No room for wasted…
-
NSWC Crane Building 198 Boiler Replacement
Project Awards Related Projects
-
Devils Lake City Embankments and Creel Bay and East Ditch Pump Stations
We provided engineering services for embankment raising and new pumping stations to modernize the local flood protection systems to reduce flood risk in the City of Devils Lake. This project consisted of a six-foot raise to the existing flood protection embankment, removal of existing pump stations, design and construction of two new pumping stations, channel…
-
Stratton Lock Expansion & Dam Improvements and EDC Support
Project Awards Related Projects
-
USACE Michigan City Breakwater Repair
Strengthening a Critical Lake Michigan HarborMichigan City Harbor serves as a key access point along Lake Michigan, supporting navigation, recreation, and the local economy. Deterioration of the east pier and detached breakwater had begun to impact structural stability, including the lighthouse at the end of the pier. This project focused on restoring these coastal features…
-
South Lake Dam Emergency Repairs
South Lake Dam: Emergency Response Where There Are No Roads Some dam emergencies happen where help can get there in minutes. This one required a 2.5-mile hike along a snowmobile trail or a boat across the lake. South Lake Dam is a 30-foot-high, 440-foot-long high-hazard earth dam constructed in the mid-19th century, located at a…
-
Acero Hawes Crossing
372 Units of Modern Living, Rooted in Smart Site Design Some of the best apartment communities feel effortless to live in. That’s by design. At Hawes Crossing in southeast Mesa, IDM Companies developed approximately 20 acres near Elliot Road and Sossaman Road into a modern apartment home community featuring 16 residential buildings with 372 units,…
-
M-231 & M-104 New Roadway Construction
This project involved the design and engineering of a new bypass roadway (M-231) and the reconstruction of a segment of M-104 in western Michigan. The scope included complete plans, specifications, and estimates for both corridors. The M-231 segment introduced several challenges, as it was a new alignment requiring earthwork balancing, drainage design, utility coordination, and…
-
I-69 I-475 Interchange Bridges CPM & Partial Deck Replacement
I-69 Corridor Reconstruction: Miles of Freeway, Seventeen Bridges, One Unified Effort This extensive infrastructure improvement project focuses on reconstructing the I-69 freeway from west of the Fenton Road bridge to Dort Highway (M-54), including ramp rehabilitation at the I-69/I-475 interchange. The project features high friction surface treatment along I-475 and ramp taper modifications to meet…
-
Dart Container Corporation’s Technology and Information Center
Bringing a company’s full research and development capability under one roof demands more than square footage. It requires a space designed to move ideas seamlessly from concept to build. As prime consultant for Dart Container Corporation, our team delivered comprehensive programming, space planning, and full architectural and engineering design for this purpose-built facility. Form Follows…