Region: Atlantic
-
Connecticut Children’s Hospital Pediatric Specialty Care Center
Designed to transport young patients from the drab healthcare spaces of the past to the engaging and experiential caregiving suites of the future, this Pediatric Specialty Care Center is anything but typical. This multi-specialty suite serves a broad spectrum of patients, from the youngest children to young adults, offering services including imaging, cardiac care, general…
-
Clean Harbors
Our team partnered with Clean Harbors to design a 60,000-square-foot multi-phase corporate office renovation crafted to elevate their brand identity and improve productivity. The space has been designed to enhance employee interaction and improve the overall functionality of their workspace while preserving its visual identity. Additionally, privacy walls were incorporated into the design to divide…
-
CFX SR417 Highway Widening and Improvements
From the initial design studies for State Route 417, the Central Florida Expressway Authority (CFX) has always envisioned an ultimate six-lane expressway to account for future growth and increased demand. The plan has been to widen the existing four-lane corridor by adding two median lanes, one in each travel direction. Colliers Engineering & Design provided…
-
Cell Therapy Production Facility
Our professionals renovated a 42,000-square-foot building to create a state-of-the-art cell therapy production facility for oncology. Our architecture and engineering teams were selected to design the cleanroom suite and all supporting systems. They also led renovations to incorporate laboratories, offices, employee support areas, and warehousing. Originally a heavy manufacturing facility with an attached office, our…
-
Kaighn Avenue Tidal Dam Emergency Repairs
The Kaighn Ave Tidal Dam was built in the early 1940s. Colliers Engineering & Design was called in when the West Tide Gate was not operating properly. After our inspection we found the 70,000 pound tide gate to be in danger of failing and declared it in need of emergency repairs. We removed and rebuilt…
-
Cambria Hotel
Currently providing civil/site engineering and land survey services for the construction of the new Cambria Hotel and retail project located at the northeast corner of Broad and Locust Streets in Center City, Philadelphia. Existing structures will be partially demolished and renovated for the addition of the 148,270 SF, 14-story hotel, which will feature 222 rooms,…
-
C. H. Corn Hydroelectric Generating Station
Located on the Ochlocknee River, about 66 miles upstream from its mouth at the Gulf of Mexico and 20 miles southwest of Tallahassee, the C. H. Corn Hydroelectric Power Generating Power Plant was operated by the City of Tallahassee Electric Utility Services until the transfer of operations. The facility is located on lands owned by…
-
Burlington-Bristol Bridge Festoon Cable Replacement and Addition
Performed full-time, on-site inspections and construction administration for the replacement and installation of new festoon cables for the Burlington-Bristol Bridge. The scope of work involved cleaning, paint removal, examination of all steel and surfaces, repairing of steel, and repainting where necessary. New festoon cables, associated cable clamps, and hardware were installed. Additionally, new festoon boxes,…
-
Bristol Hospital Emergency Department
Bristol Hospital’s Emergency Department expansion reflects a core commitment: ensuring accessible, high-quality emergency care for its growing urban community. This strategic renovation enhanced the existing 7,722-square-foot facility with an additional 16,190 square feet of thoughtfully designed space. At its heart stands a welcoming two-story waiting area, serving as a beacon of care and comfort. The…
-
Bristol Hospital Behavioral Health Suite
At Bristol Hospital’s Behavioral Health Unit, our team delivered a thoughtful design that creates a secure yet welcoming environment for mental health care. A centrally located nurses’ station maintains clear sightlines while ensuring patients have constant access to support, complemented by intimate spaces filled with natural light and calming finishes. Understanding that recovery takes many…
-
Bristol County Agricultural High School
Aligning academic and vocational studies on a state-of-the-art campus. Colliers Project Leaders provided project management services for the expansion and renovation of the Bristol County Agricultural High School. Expansion from 450 to 640 students required strategic new construction, additions, and renovations to create more cohesion among academic and vocational studies on campus and provide new…