Region: New Jersey

  • Liberty State Park Ferry Terminal Reconstruction

    Liberty State Park is one of the highest-visited state parks in New Jersey and is home to the Central Railroad New Jersey (CRRNJ) Terminal and Ferry Terminal, both of which are listed on the State and National Registers of Historic Places. The ferry terminal, consisting of ferry house platforms, fender rack piers, and timber access…

  • Kuser Warehouse

    Colliers Engineering & Design provided professional engineering services, including design and construction, for the Kuser Warehouse in Hamilton, NJ. The improvements included construction of a 339,500 S.F. warehouse with parking and loading areas, a sanitary sewer pump station, and stormwater management basins in the rear of the lot. The project provides 213 car parking spaces…

  • Keyport Yacht Club Emergency Pier Repair

    The existing timber pier at Keyport Yacht Club (KYC) was severely damaged by Superstorm Sandy in October 2012. The storm damaged not only the existing pier, which extends into the Raritan Bay for 300 feet, but also the adjacent parking lot. It also caused severe ground soil erosion. Colliers Engineering & Design performed emergency engineering,…

  • Joint Base McGuire-Dix-Lakehurst New Commercial Gate

    Colliers Engineering & Design provided geotechnical engineering services for the design and construction of a new commercial vehicle screening entrance for access to the Joint Base McGuire-Dix-Lakehurst.

  • Hunterdon County Parks and Open Space Plan

    Colliers Engineering & Design provided public outreach and facilitated visioning sessions to assist Hunterdon County with its strategic plan to identify the ultimate parkland acreage goal of the County Park System. We also identified the costs and a realistic date by which this amount of parkland could be achieved. Our professionals reviewed current and future…

  • Grassy Sound Fishing Pier Improvements Phase II

    The Grassy Sound Fishing Pier, originally constructed in the early 1940s as a vehicular bridge, has served as a fishing pier since the early 2000s. However, after decades of exposure to the elements, it had significantly deteriorated. Our evaluation revealed widespread damage, including more than 60 piles with severe section loss and numerous broken supports,…

  • Grainger Northeast Distribution Center

    Provided site design, sanitary sewer design, and air quality permitting for the new Grainger Northeast Distribution Center in Bordentown. Grainger, a leading distributor of industrial supplies, equipment, tools and materials, built its distribution center on 96 acres within the Central Crossings Business Park. The 1.4 million SF facility is the largest commercial warehouse in New…

  • Jersey City Government Annex

    Our professionals provided comprehensive engineering and design services for the new three-story, 46,000 SF government annex in Jersey City, located on the corner of Kearny Avenue and Dr. Martin Luther King Avenue. City officials anticipated the annex bringing benefits to one of the City’s most economically distressed neighborhoods. The annex, planned adjacent to a shopping…

  • Frenchtown Open Space & Recreation Plan

    Colliers Engineering & Design prepared Frenchtown’s first Open Space and Recreation Plan, an optional Master Plan Element that expresses the local municipality’s vision for open space and recreation and provides a framework for implementation. An Open Space and Recreation Plan provides a snapshot of existing conditions and identifies issues and opportunities for passive and active…

  • Foote’s Pond Hydro-raking

    New Jersey Society of Municipal Engineers (NJSME) – Project of the Year Award for Municipal Construction Management Projects Foote’s Pond, the centerpiece of a 25-acre natural sanctuary, faced severe environmental challenges after three decades of sediment and vegetation accumulation. This buildup had dramatically impacted the pond’s ecosystem, reducing its original four-foot depth to just 12…

  • Ferring Pharmaceuticals Building Addition

    Provided engineering design, landscape architecture services, and construction management for the proposed building addition and realignment of the main entrance drive from Interpace Parkway to the Ferring Pharmaceuticals office building in Parsipanny-Troy Hills. Colliers Engineering & Design professionals coordinated the work closely with the client and the architect during the project, the design of which…

  • Glendora Clock Tower Telecom Installation

    Contracted to design a telecommunications installation at the Glendora Fire Company in a residential section of Gloucester Township. In order to meet the requirements of the carrier, landlord, and Township, a functioning clock tower was proposed to house telecommunications antennas instead of a more common tower installation. The clock tower consists of steel and fiber…