Region: Mid Atlantic

  • Count Basie Theater Laser Scanning

    Colliers Engineering & Design provided 3D Laser Scanning and Revit modeling services for the historic Count Basie Theatre, a landmarked theatre in Red Bank, for the design of a new stage fly tower system to be installed in the existing fly loft above the main stage. Our surveyors conducted a 3D Laser Scanning survey of…

  • CFX SR417 Highway Widening and Improvements

    From the initial design studies for State Route 417, the Central Florida Expressway Authority (CFX) has always envisioned an ultimate six-lane expressway to account for future growth and increased demand. The plan has been to widen the existing four-lane corridor by adding two median lanes, one in each travel direction. Colliers Engineering & Design provided…

  • Cell Therapy Production Facility

    Our professionals renovated a 42,000-square-foot building to create a state-of-the-art cell therapy production facility for oncology. Our architecture and engineering teams were selected to design the cleanroom suite and all supporting systems. They also led renovations to incorporate laboratories, offices, employee support areas, and warehousing. Originally a heavy manufacturing facility with an attached office, our…

  • Kaighn Avenue Tidal Dam Emergency Repairs

    The Kaighn Ave Tidal Dam was built in the early 1940s. Colliers Engineering & Design was called in when the West Tide Gate was not operating properly. After our inspection we found the 70,000 pound tide gate to be in danger of failing and declared it in need of emergency repairs. We removed and rebuilt…

  • Cambria Hotel

    Currently providing civil/site engineering and land survey services for the construction of the new Cambria Hotel and retail project located at the northeast corner of Broad and Locust Streets in Center City, Philadelphia. Existing structures will be partially demolished and renovated for the addition of the 148,270 SF, 14-story hotel, which will feature 222 rooms,…

  • Burlington-Bristol Bridge Festoon Cable Replacement and Addition

    Performed full-time, on-site inspections and construction administration for the replacement and installation of new festoon cables for the Burlington-Bristol Bridge. The scope of work involved cleaning, paint removal, examination of all steel and surfaces, repairing of steel, and repainting where necessary. New festoon cables, associated cable clamps, and hardware were installed. Additionally, new festoon boxes,…

  • Bayshore Regional Sewerage Authority eGIS Program

    Our professionals provided Geographic Information Systems (GIS) services to Bayshore Regional Sewerage Authority to implement a web-based asset management solution for the sanitary sewer conveyance system that the Authority maintains and operates. Our team created and configured the Authority’s Esri ArcGIS Online organizational account, which enables the Authority to share maps and data online, view and…

  • GIS Facility & Asset Management Program

    Created a GIS Facility & Assessment Management Program for the Brick Township Municipal Utilities Authority (BTMUA) to enhance the efficiency of public service requests, operation and maintenance of facility plants, and sanitary sewer collection system by integrating a web-based mobile asset management solution. When creating the program, our professionals interviewed key professionals in various departments,…

  • Bloomfield Avenue Traffic Signal & Safety

    Our firm was selected by Essex County to design safety and signal improvements along the Bloomfield Avenue (C.R. 506) corridor in downtown Montclair, NJ, funded through the NJTPA’s Highway Safety Improvement Program (HSIP). The project targeted 12 signalized intersections, aiming to enhance pedestrian safety and traffic operations in this busy, walkable downtown area. Upgrades included…

  • Bloomfield Adaptive Signal Installation

    Provided transportation design services for improvements to the intersection of Glenwood Avenue and Lackawanna Place/Conger Street near the Bloomfield Train Station. Due to the heavy volumes and varying peak periods contingent on train schedules, an adaptive traffic signal system is being installed to dynamically change traffic signal timing directives and phasing based on real-time traffic…

  • Blank Street Coffee

    Blank Street Coffee’s expansion into the Boston market required a range of architecture and interior design services to bring the brand’s vision to life. The Brooklyn-based coffee shop, which has established a strong presence in New York, Washington D.C., and London, is now making its mark in Boston. We have partnered with the brand to…

  • Bethlehem Combined Sewer Outfall Replacement

    The City of Bethlehem Wastewater Treatment Plant (WWTP) received approval from the Pennsylvania Department of Environmental Protection to abandon its Combined Sewer Outfall, CSO-004, to the Saucon Creek and replace it with CSO-12 to the Lehigh River, as part of the CSO Long Term Control Plan. Under heavy wet weather condition, the 45 MGD WWTP…