Region: Michigan
-
Acero Hawes Crossing
372 Units of Modern Living, Rooted in Smart Site Design Some of the best apartment communities feel effortless to live in. That’s by design. At Hawes Crossing in southeast Mesa, IDM Companies developed approximately 20 acres near Elliot Road and Sossaman Road into a modern apartment home community featuring 16 residential buildings with 372 units,…
-
M-231 & M-104 New Roadway Construction
This project involved the design and engineering of a new bypass roadway (M-231) and the reconstruction of a segment of M-104 in western Michigan. The scope included complete plans, specifications, and estimates for both corridors. The M-231 segment introduced several challenges, as it was a new alignment requiring earthwork balancing, drainage design, utility coordination, and…
-
I-69 I-475 Interchange Bridges CPM & Partial Deck Replacement
I-69 Corridor Reconstruction: Miles of Freeway, Seventeen Bridges, One Unified Effort This extensive infrastructure improvement project focuses on reconstructing the I-69 freeway from west of the Fenton Road bridge to Dort Highway (M-54), including ramp rehabilitation at the I-69/I-475 interchange. The project features high friction surface treatment along I-475 and ramp taper modifications to meet…
-
Dart Container Corporation’s Technology and Information Center
Bringing a company’s full research and development capability under one roof demands more than square footage. It requires a space designed to move ideas seamlessly from concept to build. As prime consultant for Dart Container Corporation, our team delivered comprehensive programming, space planning, and full architectural and engineering design for this purpose-built facility. Form Follows…
-
The Rapid: Passenger Station Relocation
This project focused on relocating and constructing a new Amtrak passenger station in downtown Grand Rapids, Michigan. A key element was installing a new rail spur connecting to the existing CSX mainline near Buchanan Avenue and Pleasant Street. The revised track alignment extends north to the Rapid Central Station transit hub, creating a fully integrated…
-
MDOT I-94 DB West Ave Elm Ave US-127 Interchange
Our firm led the reconstruction, rehabilitation and widening of I-94 from east of Airport Road to west of the Grand River and east of the Cooper Street interchange to east of Dettman Road, spanning 3.5 miles. This project included converting the I-94/US-127/M-50/West Avenue interchange into a diverging diamond interchange (DDI) to enhance traffic flow and…
-
I-94 Under Trumbull Avenue
The Trumbull Avenue bridge replacement over I-94 in Detroit was advanced as an early phase of the I-94 Modernization project to address the severely deteriorated condition of the existing structure and accommodate the planned future widening of I-94 below. The new bridge is a two-span steel plate girder structure supported by tall wall abutments and…
-
Escanaba & Lake Superior Rail Road over US-2
A new single-span thru-girder railroad bridge was constructed over US-2 on a realigned track, improving rail operations while maintaining uninterrupted train service during construction. Pedestrian access along US-2 was provided through a box culvert located behind the new bridge abutment, minimizing the bridge span and enhancing safety. The design also included salvaging the existing bridge…
-
Farm Lane Road & Rail Grade Separation
Conversion of two-lane roadway with two separate at-grade railroad crossings to a four-lane boulevard section with grade separated crossings on the campus of Michigan State University. This Farm Lane Grade Separation and roadway project extended from Mt. Hope Road northerly to Wilson Road and is located on the campus of Michigan State University (MSU), in…
-
Silver Valley Elementary School
Silver Valley Elementary School, part of the Queen Creek Unified School District, is situated in the Cadence master-planned community in Mesa. While the site boundaries were established, none of the surrounding street or utility infrastructure had been designed when the project began. Our team worked closely with the master developer’s engineer to coordinate all necessary…
-
Warner Gateway 202 Offsite Improvements
The Ellsworth Road project delivered vital infrastructure improvements across 1.5 miles of roadway in Mesa, Arizona, enhancing Ellsworth Road, Warner Road, and Starfire Avenue for an industrial developer. This comprehensive undertaking included installing complete underground utilities (sewer, water, storm drains, electrical, and communication systems) alongside surface improvements such as sidewalks, landscaping, paving, street lighting, and…