Region: West

  • MDOT I-94 DB West Ave Elm Ave US-127 Interchange

    Our firm led the reconstruction, rehabilitation and widening of I-94 from east of Airport Road to west of the Grand River and east of the Cooper Street interchange to east of Dettman Road, spanning 3.5 miles. This project included converting the I-94/US-127/M-50/West Avenue interchange into a diverging diamond interchange (DDI) to enhance traffic flow and…

  • Woolf Logistics Center

    This 1,900-acre rail-served logistics center is a pivotal hub for corporations such as Mark Anthony Brewing, Nestlé, and Red Bull/Rauch/Ball (RRB). To date, approximately 4 million square feet of industrial buildings on over 800 acres have been designed and completed, making it a significant development in the region.  Our firm provided extensive planning and coordination…

  • West Point High School

    Our firm provided comprehensive civil engineering and survey services for a 69-acre campus project in the Tolleson Union High School District. This development includes eleven buildings accommodating 2,400 students, along with extensive outdoor facilities such as a football field, softball and baseball fields, tennis courts, and practice areas. Our work encompassed the design of one mile…

  • Superstition Vistas Water Campus and Transmission Main

    Our team provided regional water master planning for 8,000 acres of proposed development, expanding the Apache Junction Water District system to serve 10,000 new homes and commercial uses. We developed a hydraulic model, identified future storage and booster pump facilities, and created tie-ins to existing and future water treatment facilities with redundant groundwater supply options….

  • Sun Streams Solar

    Our firm provided comprehensive civil-related design and documentation for a 5,500-acre utility solar facility near the Palo Verde Nuclear Power Plant, followed by a 3,500-acre expansion. Our services included rezoning and entitlement, detailed drainage analyses, grading and earthwork design, and preparation of construction documents. For the expansion, we conducted extensive hydrologic and hydraulic evaluations using…

  • Silver Valley Elementary School

    Silver Valley Elementary School, part of the Queen Creek Unified School District, is situated in the Cadence master-planned community in Mesa. While the site boundaries were established, none of the surrounding street or utility infrastructure had been designed when the project began. Our team worked closely with the master developer’s engineer to coordinate all necessary…

  • Serrano Solar

    Our team provided comprehensive civil engineering and surveying services for a 1,300-acre, 170MW solar energy farm across Pinal (150 acres) and Pima (1,150 acres) Counties. The site includes solar panel arrays, battery storage, fire staging areas, and connecting gravel roads. We delivered site planning and civil design to support the minor comprehensive plan amendment and…

  • Radiance at Superstition Vistas

    Our firm provided comprehensive engineering and construction management services for a signature master-planned residential community in the east valley of the Phoenix metropolitan area, Arizona. This ambitious project encompasses 2,700 acres initially, with plans to expand to 8,500 acres, more than doubling the size of Apache Junction. The development will feature 10,000 new single-family homes,…

  • North Airport Road Water Campus & Well Improvements

    The Phase 1 Expansion of the North Airport Road Water Campus represents a comprehensive initiative to enhance water treatment capabilities and ensure long-term infrastructure reliability. Currently, the project involves installing two additional arsenic filter vessels, recirculation pumps, and day tank booster pumps, alongside constructing a reclaim tank with all necessary appurtenant piping. Simultaneously, work progresses…

  • Warner Gateway 202 Offsite Improvements

    The Ellsworth Road project delivered vital infrastructure improvements across 1.5 miles of roadway in Mesa, Arizona, enhancing Ellsworth Road, Warner Road, and Starfire Avenue for an industrial developer. This comprehensive undertaking included installing complete underground utilities (sewer, water, storm drains, electrical, and communication systems) alongside surface improvements such as sidewalks, landscaping, paving, street lighting, and…

  • Floreo at Teravalis Water Campus and Wells #1 and #3

    Teravalis, a visionary 37,000-acre development, has broken ground in Phoenix’s rapidly growing West Valley with its first phase: a 3,000-acre master-planned community. This ambitious project will ultimately feature 100,000 homes, accommodate 300,000 residents, and include 55 million square feet of commercial space. This initial phase establishes the foundation for future expansion through thorough infrastructure planning…

  • Pima and Happy Valley Road

    Our expert survey team played a pivotal role in the City of Scottsdale’s Pima Road and Happy Valley Road improvement project. We provided comprehensive construction staking and survey control services, establishing precise horizontal and vertical control for various roadway construction elements. Our work encompassed rough and fine grading, drainage systems, utility installations, curb placement, and…