Region: Queen Creek
-
R2742.0101 Queen Creek Wash Trail Relocation – Contract 2022-064/TO 1 & TO 2
Queen Creek Wash: Keeping the Trail Open Residents of Queen Creek love their trail system. The challenge is that part of one popular segment shares its path with a regional flood outfall draining hundreds of square miles of watershed. Along Queen Creek Wash at its intersection with Ellsworth Road, FEMA has mapped the area as…
-
Harvest Storage Tank and Booster Pump Station
As part of our on-call contract with the Town of Queen Creek, we designed and performed the construction management for this partially buried, pre-stressed 2.0 MG concrete water storage tank and a vertical turbine booster pump station with associated electrical controls and equipment. This project enhances the Town’s water system operations and service for current…
-
Church Farms East Storage Tank and Booster Pump Station
As Engineer of Record (EOR) for the Town of Queen Creek’s Church Farms East Water Storage Tank and Booster Pump Station project, our firm provided comprehensive engineering and construction management services. We designed and oversaw construction of a partially buried 3.0 million gallon concrete water storage tank and a 4,000 gallons per minute (GPM) vertical…
-
Barney Farms Storage Tank & Booster Pump Station
Our Water Infrastructure team provided engineering design for a storage tank and booster pump station on Meridian Road for the Town of Queen Creek, enhancing water system operations for existing and future customers. Phase One involved designing a 3.0 MG pre-stressed concrete storage tank for optimal strength and durability. Strategically placed to minimize visual impact,…