Region: New Jersey

  • Sunrise Mountain Lakes

    Colliers Engineering & Design was retained to provide survey, site design, environmental, and geotechnical services for a senior living development in Mountain Lakes. Over the years, Sunrise Senior Living communities have redefined senior care, and they continue to grow throughout the United States, Canada, and the United Kingdom. This $25 million project includes a three-story,…

  • South Inlet Transportation Improvement Project

    Provided transportation and construction design services for the CRDA’s South Inlet Transportation Improvement Project, associated with the construction of the $2.4 billion Revel Casino and Resort in Atlantic City, NJ. Revel will consist of 4,000 hotel rooms; approximately 175,000 SF of casino gaming space; and 330,000 SF of mixed retail/restaurant entertainment space. In order to…

  • Toms River MUA Solar PV System Installation

    2017 Energy Savers Wave Award – Association of Environmental Authorities Retained by Toms River Municipal Utilities Authority (TRMUA) to provide design, bidding, and construction administration services for an innovative renewable energy project that consisted of the installation of a 120.15 kW net-metered solar photovoltaic (PV) system on the roof of the TRMUA administration building and…

  • Six Flags Great Adventure – The Joker Coaster

    The Six Flags Great Adventure Joker roller coaster is a 4-D, free-fly coaster – a totally new concept in roller coaster engineering – and it lifts riders straight up a 12-story, 90-degree hill before flipping them head-over-heels at least six times along a weightless journey. Riders are strapped into rotating “wing seats” with no track…

  • Silver Lake Drainage Outfall Installation

    Provided design services, permitting, and construction administration and inspection for the installation of a new 48” HDPE drainage outfall pipe for Silver Lake in Belmar. The existing pipe was undersized, old, and often suffered from breakage. Because the system emptied into the Atlantic Ocean, it was easily clogged by sand and could not drain correctly due…

  • Seton Hall Preparatory School Verducci Field

    This multi-purpose field was designed to replace an existing grass sports complex with poor site drainage. Stormwater management methods were utilized to store the stormwater runoff beneath the synthetic turf prior to draining the site. The project involved development of plans, including grading, stormwater management, drainage, soil erosion, and sediment control. Permits were required for…

  • Sea Isle City Municipal Public Fishing Pier

    2021 NJSME Municipal Design Project of the Year Award As the Sea Isle City Municipal Public Fishing Pier was to be constructed within wetlands, among freshwater and saltwater, Colliers Engineering & Design worked closely with the NJDEP to develop a design that would have the least impact on the surrounding environment. The result is a…

  • Sea Isle Boulevard Reconstruction

    New Jersey Alliance for Action’s 2019 Distinguished Engineering Award Providing construction inspection services for this 1.8-mile roadway reconstruction and resurfacing project for Cape May County, Federal Project No. STP-0115 (104). The scope of work involves the placement of over 124,000 cubic yards of I-11 material to raise the base elevation of the existing roadway to…

  • Riverton (Former National Lead Site)

    Retained to engineer the largest brownfield redevelopment project in the history of the State of New Jersey. This project entails the redevelopment of the former National Lead Site, which is a contaminated industrial brownfield site with complicated subsurface soil conditions. The project consists of a mixed-use waterfront development with more than 2.8 miles of waterfront;…

  • Rise Academy Athletic Field

    Provided comprehensive design services for a recreational space project at Rise Academy, a TEAM charter school in Newark. The project involved the construction of a new athletic field for the Academy, which is a middle school serving 400 students located at 21 Ashland Street. The project required a very cost-effective design approach, in order to…

  • Reconstruction of Bridge S-17

    Provided Monmouth County with construction inspection and contract administration services during the reconstruction of Bridge S-17, on County Route 10 (West Front Street) over Swimming River in the Borough of Red Bank and the Township of Middletown. This federally-funded project included the construction of an approximately 488-ft long curved steel girder bridge consisting of six…

  • Rabkin Park Field Improvements

    Rabkin Park, jointly owned by the Township of Union and the Union Township Board of Education, has long been a vital sports venue for local teams. The park’s multipurpose fields have served the high school’s junior varsity soccer, freshman football, JV baseball, JV softball, and field hockey teams, as well as the local Pop Warner…