Region: Bloomfield Township
-
Bloomfield Adaptive Signal Installation
Provided transportation design services for improvements to the intersection of Glenwood Avenue and Lackawanna Place/Conger Street near the Bloomfield Train Station. Due to the heavy volumes and varying peak periods contingent on train schedules, an adaptive traffic signal system is being installed to dynamically change traffic signal timing directives and phasing based on real-time traffic…