Region: Arizona
-
Serrano Solar
Our team provided comprehensive civil engineering and surveying services for a 1,300-acre, 170MW solar energy farm across Pinal (150 acres) and Pima (1,150 acres) Counties. The site includes solar panel arrays, battery storage, fire staging areas, and connecting gravel roads. We delivered site planning and civil design to support the minor comprehensive plan amendment and…
-
Radiance at Superstition Vistas
Our firm provided comprehensive engineering and construction management services for a signature master-planned residential community in the east valley of the Phoenix metropolitan area, Arizona. This ambitious project encompasses 2,700 acres initially, with plans to expand to 8,500 acres, more than doubling the size of Apache Junction. The development will feature 10,000 new single-family homes,…
-
North Airport Road Water Campus & Well Improvements
The Phase 1 Expansion of the North Airport Road Water Campus represents a comprehensive initiative to enhance water treatment capabilities and ensure long-term infrastructure reliability. Currently, the project involves installing two additional arsenic filter vessels, recirculation pumps, and day tank booster pumps, alongside constructing a reclaim tank with all necessary appurtenant piping. Simultaneously, work progresses…
-
Warner Gateway 202 Offsite Improvements
The Ellsworth Road project delivered vital infrastructure improvements across 1.5 miles of roadway in Mesa, Arizona, enhancing Ellsworth Road, Warner Road, and Starfire Avenue for an industrial developer. This comprehensive undertaking included installing complete underground utilities (sewer, water, storm drains, electrical, and communication systems) alongside surface improvements such as sidewalks, landscaping, paving, street lighting, and…
-
Floreo at Teravalis Water Campus and Wells #1 and #3
Teravalis, a visionary 37,000-acre development, has broken ground in Phoenix’s rapidly growing West Valley with its first phase: a 3,000-acre master-planned community. This ambitious project will ultimately feature 100,000 homes, accommodate 300,000 residents, and include 55 million square feet of commercial space. This initial phase establishes the foundation for future expansion through thorough infrastructure planning…
-
Pima and Happy Valley Road
Our expert survey team played a pivotal role in the City of Scottsdale’s Pima Road and Happy Valley Road improvement project. We provided comprehensive construction staking and survey control services, establishing precise horizontal and vertical control for various roadway construction elements. Our work encompassed rough and fine grading, drainage systems, utility installations, curb placement, and…
-
Paloma Vista Logistics Center
In Buckeye, Arizona, this major industrial development has transformed approximately 180 acres into an employment hub. The project is 50% built out, with two cross-dock facilities totaling nearly 1.5 million square feet. Our team provided onsite grading, drainage, water, and wastewater design, as well as designs for offsite improvements to surrounding roadways and a mile-long…
-
Nikola Manufacturing Plant
Nikola Motors is revolutionizing the global transportation landscape with its groundbreaking approach to zero-emission hydrogen/battery-electric vehicles, particularly with its Class 8 semi-trucks. Our firm is supporting this visionary endeavor by developing a state-of-the-art greenfield manufacturing plant that is already over 700,000 sq. ft. in size with continued expansion expected in the near future. In addition to…
-
Moon Valley Pump Station and Water Main
Our firm provided engineering and construction management services for a major water infrastructure project in Phoenix, Arizona. The project involved a 2,500 GPM raw water pump station supplying irrigation water from the Arizona Canal to three golf courses and the design of a six-mile raw water transmission main. This transition from potable to raw water…
-
Lakin Park
In Goodyear, Arizona, a 695-acre mixed-use development was completed at the intersection of Cotton Lane and Maricopa County Route MC-85. This project integrated industrial, commercial, and multi-family residential components. The development began with rezoning and master planning for sewer and water infrastructure. A major challenge involved resolving floodplain issues through Conditional Letter of Map Revisions…
-
Harvest Storage Tank and Booster Pump Station
As part of our on-call contract with the Town of Queen Creek, we designed and performed the construction management for this partially buried, pre-stressed 2.0 MG concrete water storage tank and a vertical turbine booster pump station with associated electrical controls and equipment. This project enhances the Town’s water system operations and service for current…
-
Church Farms East Storage Tank and Booster Pump Station
As Engineer of Record (EOR) for the Town of Queen Creek’s Church Farms East Water Storage Tank and Booster Pump Station project, our firm provided comprehensive engineering and construction management services. We designed and oversaw construction of a partially buried 3.0 million gallon concrete water storage tank and a 4,000 gallons per minute (GPM) vertical…