Market: Local Government Region: Texas

New Sulphur Springs Lift Stations

San Antonio, Texas

For this 5,000 EDU lift station, tied into a new 24-inch and 18-inch sewer extension, Colliers Engineering & Design provided design for 1,880 linear feet of 36-inch gravity sewer, 2,765 linear feet of 30-inch gravity sewer, and 3,250 linear feet of 15-inch gravity sewer- which terminates at an existing San Antonio Water System (SAWS) 36-inch sewer. This design serves two subdivisions and is publicly bid in accordance with SAWS requirements. This design required easement acquisition, which was partially reimbursable by SAWS to the developer.

Share this:

SERVICES

  • Civil/Site
  • Environmental Services
  • Municipal Services
  • Project Management
  • Stormwater Management
  • Survey/Geospatial