Water / Wastewater

View More Projects

Canal in Phoenix, Az
Aerial of water storage tank under construction

Professional looks at GIS asset management tracking sanitary sewers

We serve municipal and regional utility authorities, sewer departments, educational facilities, and private sector clients. Whether you operate a small community system or manage infrastructure for a regional authority, our team scales its approach to match the complexity and needs of your organization.

We provide grants and funding assessments to identify federal, state, and local financial assistance programs that align with your project. We also conduct user rate studies that help utilities establish sustainable revenue structures to support both current operations and future capital investment. That financial planning work happens alongside the engineering so that funding strategy and project design stay in sync.

An inflow and infiltration (I&I) study evaluates how much stormwater and groundwater is entering a sanitary sewer system through cracks, faulty connections, or aging infrastructure. Excess I&I can overload treatment plants, trigger regulatory violations, and drive up operating costs. We recommend these studies when a system is experiencing capacity issues, frequent overflows, or unexplained increases in treatment volume.

Yes. Our engineers design new treatment plants, pump stations, and distribution and collection systems, and we also evaluate and rehabilitate aging infrastructure. The approach depends on what the system needs. Sometimes a targeted repair or upgrade is the most cost-effective path forward; other times a full replacement makes more sense. Our evaluation and modeling work helps clients make that determination with confidence.

Our construction engineering and inspection professionals provide oversight from groundbreaking through closeout. That includes reviewing contractor submittals, monitoring work for compliance with project specifications, and keeping the project on schedule and on budget. Having the same team involved from planning through construction means fewer gaps and a smoother handoff at every stage.