Redhouse Lake Dam and Bridge Rehabilitation

Salamanca, NY

Bridge

Our team of professionals provided comprehensive on-site construction inspection and support for the replacement of a three-span concrete arch bridge, as well as the rehabilitation of a concrete fixed crest and earthen dam.
Throughout the project, careful attention was given to ensuring all work complied with the detailed plans and specifications. Our team monitored the construction process on-site, with inspections documented per the NYSDOT’s standards. Additionally, a thorough review of submittals and change orders helped maintain project integrity while coordinating on-site material testing to ensure compliance with required standards.
In a related bridge replacement project, the existing cast-in-place concrete arch bridge was replaced with precast concrete arch span units. The project benefitted from a careful review of shop drawings and prompt responses to Requests for Information (RFIs), allowing the work to progress efficiently and stay on schedule. The detailed oversight ensured that both the bridge and streetscape improvements were completed with high standards of quality and safety, delivering long-term benefits to the community.