Search
Close this search box.
Market: Bridges Federal/State Agency Region: Florida

Ravenswood Road Over Dania Cut-Off

Fort Lauderdale, FL

Colliers Engineering & Design provided design services for the replacement of Bridge 864028 over the Dania Cut-off Canal, as well as the reconstruction of Ravenswood Road from SW 45th St. to SW 42nd St. (0.284 miles) inclusive of the relocation of existing utilities. Improvements to Ravenswood Road followed provisions that meet U.S. Coast Guard navigational requirements, including a higher vertical profile and replacement of the existing fender system. The new bridge consists of a 3 span bridge with a total length of approximately 190’ utilizing FIB-36 beams. The substructure consists of regular intermediate pile bents and end bents. MSE retaining walls confine the embankment on both sides of the bridge approaches.

Share this:

SERVICES

  • Bridge Engineering